Smart Bund Dewatering & Oil Spill Interlock Station

Mains-powered bund dewatering with free-oil interlocks, pump and valve supervision, custom PCB controls, and a Web platform and mobile App.

All Products
Model RC-BDW-600
bund-dewateringoil-spill-monitoringtransformer-bundrainwater-pump-controlspill-containmentgrid-poweredcustom-pcbindustrial-iot

Overview

The RC-BDW-600 is a mains-powered bund dewatering and oil spill interlock station from REDCOAST.LTD for outdoor transformer compounds, generator yards and industrial oil-storage areas. It removes accumulated rainwater through an approved drainage or treatment route while monitoring free oil, sump level, pump operation and discharge-valve position. Utilities, facility operators and infrastructure integrators receive a coordinated package of field equipment, local controls, a Web management platform and a mobile App. The reference configuration serves one containment bund with one pump; the specifications below are engineering design values to be confirmed and verified for the ordered build.

Key Features

  • Oil-sensitive pumping permission: A floating free-oil detector and a separate water-presence permissive prevent pumping when the monitoring conditions are unsuitable.
  • Independent containment interlock: Oil alarm, detector fault and emergency inhibit contacts interrupt pump permission through a wired relay circuit independent of cloud connectivity.
  • Mechanical closure on power loss: A spring-return discharge valve closes when its electrical supply disappears, while the pump contactor releases.
  • Verified valve sequence: The controller opens the discharge valve, confirms its open limit and then starts the pump; missing feedback blocks the start.
  • Continuous level visibility: A 4–20 mA level transmitter supports adjustable start and stop thresholds, with a separate high-high float for escalation.
  • Pump fault diagnosis: Motor overload, abnormal current, excessive runtime and failure of the water level to fall generate distinct maintenance events.
  • Maintenance records: The platform records operating hours, starts, alarms, acknowledgement history, valve checks and service photographs against each bund asset.
  • Project-specific electronics: REDCOAST.LTD develops the controller, isolated acquisition and actuator-interface PCBs to match the site's instrumentation, motor starter and supervisory system.

Technical Architecture

The reference package combines an outdoor control cabinet, a guided floating oil detector, an independent water-permit probe, a hydrostatic level transmitter, a high-high float, a submersible drainage pump and a normally closed discharge valve. A screened intake limits debris entry, and an engineered anti-siphon arrangement prevents continued drainage after the pump stops. The oil detector sits where a floating layer can reach it, away from inlet turbulence; baffles must calm the water without creating an isolated pocket. The pump draws from below the monitored surface, and a maintained minimum water depth keeps the detector and pump within their operating limits.

The reference sensing method combines conductivity and vibronic liquid detection. Its indicative alarm point is a 10 mm floating kerosene layer under static freshwater conditions, rather than a dissolved-oil concentration. This selection basis follows the operating limits documented in the Endress+Hauser NAR300 technical information; the delivered sensor and actual site oil require acceptance testing. Emulsions, detergents, water-soluble chemicals and very thin films fall outside this simple free-oil interlock. Pumped water therefore goes to the site's approved treatment or collection route; the station itself does not establish discharge quality.

The REDCOAST.LTD main board runs the level state machine and records pump current, valve limits and sensor health. A separate wired permissive chain drops the pump contactor and valve supply when an oil or critical detector alarm occurs; software cannot override that chain through an ordinary remote command. Oil and emergency events latch until inspection and an authorized local reset. The Web platform receives timestamped events and trends, while the mobile App supports acknowledgement and work orders. A high-high level condition escalates the response but never overrides an active oil inhibit; the site must provide sufficient retained volume and an emergency recovery plan.

Connectivity & Power

These installations normally have a permanent electrical supply. The reference complete station uses AC 220–240 V, 50 Hz, with separate protected branches for the pump and control equipment. The controller power supply accepts AC 100–240 V, 50/60 Hz; a different site voltage or frequency requires a matched pump, contactor and protection schedule. No solar panel is included. The reference pump has a 0.55 kW motor output and an electrical-input allowance of up to 0.80 kW, distinct from the 18–35 W control-and-sensing load. A 60 W cabinet heater is an optional additional load.

Ethernet suits sites with an operational network, while a regional-band LTE Cat 1 modem serves yards without a convenient data connection. Isolated RS-485 supports local Modbus RTU equipment; Modbus TCP, HTTPS and MQTT over TLS support supervisory integration. Cellular coverage, SIM service and private-APN access are checked during design. A network outage leaves local control active and stores records for later upload. A mains outage stops pumping and mechanically closes the valve; remote reporting resumes after power returns, and the platform can separately flag missed heartbeats. Restart requires healthy local permissives, and oil or emergency latches remain set. Remote access uses named accounts, permission controls and an outbound connection or customer VPN.

Protection & Reliability

The cabinet is designed for IP66 protection with sealed cable entries, a sunshield and a smooth finished enclosure. Its carbon-steel shell and mounting frame receive hot-dip galvanizing beneath the final powder coating; a fluorocarbon topcoat is an alternative for demanding coastal exposure. The coating system, substrate preparation and inspection plan are selected together rather than using a salt-spray duration as a service-life guarantee.

The reference ambient range is -20 to +50 °C, while the wet system requires unfrozen liquid between +1 and +40 °C. Cabinet heating does not protect an exposed sump from ice; cold sites need separately engineered pipe and sump frost protection. Surge protection, protective earthing, motor overload protection and segregation between mains wiring and instrumentation address electrical reliability. Cabinet anchors and brackets are sized for the local wind loading. Replaceable interface boards, accessible terminals and removable sensor assemblies support repair without replacing the whole station.

Application Scenarios

  • Outdoor transformer containment: A substation bund collects rainwater around oil-filled equipment. The station manages routine water removal and retains an alarmed condition for inspection, with status available to the utility's supervisory system.
  • Data-centre utility yards: Several transformer and standby-generator areas need drainage oversight between maintenance visits. Each station operates independently while a shared dashboard shows water accumulation, pump faults and service priorities.
  • Industrial lubricant storage: Outdoor bunds around mineral-oil tanks can lose useful storage volume as rain accumulates. Controlled dewatering reduces manual drain operation while routing water to the site's designated treatment or collection system.
  • Municipal fleet depots: Diesel storage and service-yard containment areas need clear responsibility for drainage and spill response. A suitable hazardous-area assessment determines the field equipment package, and local alarms direct staff to the affected asset.
  • Power-generation auxiliary compounds: Bunds around auxiliary oil equipment require reliable local control even when communications are unavailable. Hardwired inhibit inputs can coordinate drainage with the facility's existing incident-response controls.

Case-style Examples

The following are illustrative engineering configurations, not reported customer installations or guaranteed savings.

Transformer bund retrofit. An operator has a 120 m² containment catchment and normally opens a drain manually after rain. At an illustrative rainfall intensity of 25 mm/h and runoff coefficient of 1.0, incoming water is approximately 3 m³/h. A reference pump selected to deliver 6 m³/h at the verified 8 m total dynamic head has capacity above that illustrative inflow; the engineer still checks peak storms, freeboard, pipe losses and periods when pumping is inhibited. The proposed package adds a local cabinet, free-oil interlock, valve feedback and Ethernet reporting. The resulting workflow replaces routine manual switching with supervised cycles and a traceable exception queue.

Generator-yard drainage supervision. A facility operates four separate generator bunds and wants to identify blocked strainers before water reaches the high-high level. Four independent stations use LTE where network cabling is unavailable, with motor current and level trends reported to one dashboard. A level-not-falling alarm prompts inspection, while an oil alarm stops the affected pump and latches its valve closed. Staff then arrange inspection and recovery through the site's response procedure; no remote acknowledgement releases contaminated water automatically.

Customization & Selection Guide

Begin with the liquid inventory and drainage destination. Identify whether the likely spill is mineral transformer oil, diesel, an ester insulating fluid or another substance, and provide its safety data sheet. The reference oil-density envelope is 0.70 to less than 0.90 g/cm³; denser fluids require a different qualification assessment. Measure the rainwater conductivity and identify detergents, sediment, seawater ingress and freezing exposure. These details determine whether the reference detector is suitable or a different sensing package is necessary.

Next size the hydraulics from catchment area, design rainfall, retained volume and total dynamic head. The reference duty is 6 m³/h at 8 m head, with a DN32 discharge assembly; it is a selection point, not a promise of maximum flow at maximum head. A controller-only retrofit is appropriate when the existing pump and valve can provide the necessary status contacts and loss-of-power behavior. Larger sites may need a separately sized pump or a duty/standby arrangement. Remaining containment volume must accommodate a storm during an oil lockout or power outage.

Finally choose network access, cabinet finish and approval scope. Ordinary safe-area installations use the standard control cabinet; classified areas require appropriately certified field devices, barriers, wiring and installation practices, with the cabinet outside the classified zone. An oil sensor's component certification does not certify the entire station. Automatic drainage also remains subject to the site's discharge authorization and any downstream treatment requirements.

Deployment & After-sales

Installation starts with a drainage survey and a review of bund integrity. The sump must provide room for the float guide, pump removal and cleaning; an indicative reference space is 800 × 800 × 700 mm, subject to the selected assemblies. Locate the cabinet above the assessed flood level, protect field cables mechanically and preserve the liquid-tightness of any containment penetrations. The discharge arrangement includes a non-return valve, verified isolation and anti-siphon protection suited to the receiving system.

Factory acceptance covers I/O mapping, alarm latching, simulated detector faults, valve sequencing and interrupted power. Site acceptance verifies actual pump duty, level thresholds, sensing with an approved contained test procedure, outlet routing and loss-of-power closure. Delivery milestones include design approval, component procurement, PCB assembly, firmware configuration and acceptance testing; the quotation sets the schedule after these dependencies are known.

Handover includes wiring drawings, PCB and firmware revision identification, an I/O register, configuration backup and maintenance instructions. Initially inspect the sump, intake and sensing surfaces monthly and function-test the interlocks at an agreed interval; operating experience and component instructions determine the continuing schedule. REDCOAST.LTD can include remote diagnostics, replacement controller boards and partner-assisted commissioning. Warranty duration, response times and spare-part availability are defined in the project agreement.

Standards & Compliance

The verification plan uses IEC 60529 for enclosure protection and the applicable parts of IEC 61439 for the completed low-voltage controlgear assembly. Industrial EMC assessment considers IEC 61000-6-2 for immunity and IEC 61000-6-4 for emissions where no more specific product standard applies. Referencing these standards defines a verification route, not an existing test certificate for this new configuration.

Where explosive atmospheres are present, equipment selection and installation must follow the applicable approval system and requirements such as IEC 60079-14:2024. The base station carries no blanket ATEX, IECEx or SIL claim. CE marking, radio approvals and substance-compliance documentation are addressed for the destination and supplied build.

CIRIA C736 provides a useful engineering reference for containment risk assessment and design. Local environmental requirements, drainage permissions and firewater strategy remain project-specific. This controller does not turn a bund into an oil separator or provide a certified effluent concentration.

Why REDCOAST.LTD

REDCOAST.LTD delivers the field hardware, control logic, Web platform and mobile App as one coordinated outdoor IoT solution. In-house hardware development includes new PCB layouts, isolated analog inputs, monitored digital interfaces, actuator control, power distribution and project-specific firmware. Qualified specialist sensing heads and pumps are selected around that architecture, with their capabilities and limitations documented. This approach lets the project team adapt existing assets, integrate customer protocols and maintain a controlled hardware revision without forcing every installation into a generic monitoring box.

Send REDCOAST.LTD your bund dimensions, liquid inventory, rainfall basis, discharge route and electrical supply to request a customized RC-BDW-600 configuration.

Specifications

Sensing & Application

Reference coverage
1 bund with 1 monitored sump
Reference free-oil alarm point
10 ± 1; kerosene on static freshwater, selected detector specification mm
Reference oil density
0.70 to <0.90; floating, non-conductive, water-insoluble liquid g/cm³
Minimum water conductivity
10; freshwater only for reference sensing package µS/cm
Level transmitter range and output
0–2 m water column; 4–20 mA
Level transmitter reference accuracy
±0.5 of full scale at 20 °C %
Independent permissives and alarms
1 water-presence probe; 1 high-high float; oil-alarm and detector-health contacts

Hydraulics & Discharge Assembly

Reference pump duty
6 at 8 m total dynamic head; final pump-curve verification required m³/h
Reference pump motor output P2
0.55 kW
Reference discharge connection
DN32; DN40 alternative after hydraulic sizing
Maximum reference screened particle size
5; fibrous debris excluded mm
Discharge valve
DN32 full-bore ball valve; 24 V DC spring-return normally closed; open/closed feedback
Valve closure design requirement
≤30 at +20 °C under specified differential pressure; verified on assembled valve s
Drainage safeguards
Non-return valve; engineered anti-siphon arrangement; pump-stop interlock
Indicative sump clear space
800 × 800 × 700; width × length × depth, checked against final equipment mm

Mains Power & Electrical Protection

Complete reference station input
AC 220–240, single phase, 50 Hz V
Controller power-supply input
AC 100–240, 50/60 Hz; does not define pump compatibility V
Reference pump electrical input P1
≤0.80 allowance; final selected pump data governs kW
Control and sensing consumption
18–35; excludes pump, valve actuator and heater W
Auxiliary DC supply
24 V DC, 5 A maximum
Optional cabinet heater
60, thermostat controlled W
Protection arrangement
Protective earth, branch MCBs, motor overload and Type 2 SPD; residual-current protection selected for site rules

Controller & Interlocks

Digital inputs
16 isolated, 24 V DC
Analog inputs
4 isolated 4–20 mA channels, 16-bit conversion
Relay outputs
8 dry contacts, 2 A at 30 V DC resistive; external contactors switch motors
Powered outputs
4 channels, 24 V DC, 0.5 A per channel
Control scan interval
100 ms
Electrical trip response requirement
≤1 from a confirmed hardwired trip input to pump-contactor release; excludes sensor and hydraulic response s
Illustrative sump level settings
Stop 250; start 400; high-high 600 above sump invert mm
Oil-event reset
Latched stop; local authorized reset after clear conditions and inspection

Connectivity & Data

Ethernet
1 × 10/100 Mbit/s
Cellular option
4G LTE Cat 1; regional-band modem and external antenna
Serial interfaces
2 isolated RS-485 ports; 9,600–115,200 baud
Integration protocols
Modbus RTU, Modbus TCP, HTTPS, MQTT over TLS 1.2 or later
Local trend retention
At least 90 days for 8 channels at 60-second intervals; separate event records
Remote management
Web platform and mobile App; role-based access, event acknowledgement and service records

Enclosure & Operating Conditions

Cabinet dimensions
600 × 500 × 250; height × width × depth, excluding sunshield and bracket mm
Cabinet ingress-protection design target
IP66 for the assembled cabinet; verification on the ordered build
Reference floating detector protection
IP67; surface-floating installation, not continuous submersion
Reference ambient temperature
-20 to +50; liquid circuit must remain unfrozen °C
Reference pumped-liquid temperature
+1 to +40 °C
Relative humidity
5–95, non-condensing inside cabinet % RH
Cabinet and bracket finish
Hot-dip galvanized steel with smooth matte powder topcoat, 80–120 µm; RAL 7035 or RAL 7016
Wet-side materials
316L stainless-steel instrument supports; pump and valve wetted materials selected for the declared oil and water chemistry

Capabilities — configurable per project

Specifications are tailored to each project — the options below show what we can support.

Delivery Configuration

  • Controller retrofit for an existing pump and valve
  • Complete single-pump reference package
  • Engineered duty/standby two-pump package

Site Electrical Supply

  • 230 V single phase, 50 Hz
  • 120 V single phase, 60 Hz with matched pump
  • 400 V three phase, 50 Hz with separate motor starter

Network Integration

  • Ethernet and Modbus TCP
  • LTE Cat 1 and MQTT over TLS
  • Customer private APN or VPN with Ethernet backup

Sensor Qualification

  • Freshwater and floating mineral-oil reference package
  • Alternative insulating-fluid package after sample testing
  • Certified hazardous-area field package with matched barriers

Outdoor Finish & Climate

  • RAL 7035 smooth matte powder coating
  • RAL 7016 fluorocarbon topcoat for assessed coastal exposure
  • Sunshield and 60 W anti-condensation heater package

Related solution guidance

Frequently Asked Questions

What does an automatic bund dewatering station do?

It starts a drainage pump when water reaches the configured level and the sensing and valve permissives are healthy. The RC-BDW-600 also supervises free oil, pump faults and discharge-valve position, and sends status to a Web platform and mobile App. The discharge must follow the site's approved collection or treatment route.

Does the oil detector prove that discharged water contains less than 5 mg/L of oil?

No. The reference detector identifies a floating oil layer under specified conditions; it is not a calibrated oil-in-water concentration analyzer. Thin films, emulsions and dissolved pollutants can escape that detection method, so any concentration limit requires suitable treatment, sampling or separately qualified analytical instrumentation.

What happens during a power failure or loss of internet connectivity?

Loss of mains power releases the pump contactor and allows the discharge valve to spring closed without a battery. Loss of internet connectivity leaves the local controller and wired interlocks operating, with records stored for later transmission. A power failure prevents active remote reporting until power returns, although the platform can flag a missing heartbeat.

Can the controller retrofit an existing transformer bund pump?

Yes, after checking the pump's electrical rating, duty curve, motor protection and available status contacts. A compatible discharge valve needs verified open/closed feedback and the required closure behavior on power loss. The retrofit scope also includes sensor positioning, anti-siphon protection and inspection of containment penetrations.

How should a bund dewatering pump be sized for rainfall?

Estimate inflow as catchment area in m² multiplied by rainfall intensity in mm/h and runoff coefficient, divided by 1,000 to obtain m³/h. For example, 100 m² at 50 mm/h and a coefficient of 1.0 produces 5 m³/h. Select the pump at the actual total dynamic head, then check operating margin and retained storage during an oil lockout, extreme storm or power outage.

Can RC-BDW-600 operate in a hazardous area or monitor every insulating oil?

The reference cabinet is installed in a non-classified location, and the base package has no blanket explosion-protection certification. Classified installations require suitable certified probes, pumps, barriers and wiring selected for the assessed zone and substances. Ester fluids, solvents and unusual water chemistry require separate compatibility and sensing tests before a configuration is offered.

What information is needed for a customized quotation?

Provide the bund and sump dimensions, stored-liquid safety data sheets, catchment area, design rainfall, discharge destination and available electrical supply. Include pump duty or pipe elevations, the hazardous-area assessment, climate conditions and preferred network connection. REDCOAST.LTD uses these inputs to define the hardware, custom PCB interfaces, control logic, software scope and acceptance tests.

Interested in Smart Bund Dewatering & Oil Spill Interlock Station?

Tell us your scenario and we'll respond with a tailored approach — every project is engineered to your requirements.

Request a Custom Quote

We typically respond within one business day.